Welcome On Mobius

Mobius was created by professionnal coders and passionate people.

We made all the best only for you, to enjoy great features and design quality. Mobius was build in order to reach a pixel perfect layout.

Mobius includes exclusive features such as the Themeone Slider, Themeone Shorcode Generator and Mobius Grid Generator.

Our Skills

WordPress90%
Design/Graphics75%
HTML/CSS/jQuery100%
Support/Updates80%

Diffuse degassing monitoring, summit crater of Teide volcano, Tenerife, Canary Islands

JUN7: 1 to 29, 2018 (days off June 2, 3, 9, 10, 16, 17, 23 and 24)
JUL7: June 29 to July 27, 2018 (days off June 30, July 1, 7, 8, 14, 15, 21 and 22)
AUG6: July 27 to August 24, 2018 (days off July 28 and 29 and August 4, 5, 11, 12, 18 and 19)
SEP6: August 24 to September 21, 2018 (days off August 25 and 26 and September 1, 2, 8, 9, 15 and 16)
1 Student per month

internships_11_2018

The selected student for this programme each month will perform field and lab work related to the diffuse volcanic degassing monitoring survey of the summit crater of Teide volcano, Tenerife, Canary Islands. The student will weekly perform one or two days of fieldwork and three or four days of lab work.
During this programme the student will learn how to:

  • perform in-situ soil CO2 and H2S efflux measurements
  • collect soil gas samples for chemical and isotopic analysis
  • apply statistical-graphical analysis on the diffuse degassing survey data
  • estimate the total diffuse CO2 emission from  the summit crater of Teide volcano using Gaussian simulations
  • perform chemical analysis of the collected soil gas samples by means of micro-chromatography (microGC) and quadrupole mass spectrometry (QMS)